At the same time level two was begun, the substructure for the two landings also started. This meant a lot more holes were dug for concrete, and a lot more trips to Lowe's and Home Depot were made to get it all (and yes, we did figure out what the car could hold with two less people in it!).

Concrete holes.

Part of the substructure.

Decking here went pretty quickly also.

Another view of the landings.